A plan the plant can actually carry out.
VISIONE computes the plan within your plant’s real limits: material and capacity together, in minutes, with no changes to the ERP.
The problem
The ERP records everything. Nobody can plan with it.
Many reports
Every department, its own number.
Seen too late
Status arrives the next day.
No capacity limit
The standard plan ignores the machines.
What it is
Advanced planning: material and capacity in one calculation.
Real limits
Every machine and every shift has one.
At the same time
Material and capacity, solved together.
Fast
A new plan in minutes, so it can be redone every day.
How it works
Three inputs, one engine, three outputs and a loop.
Plant model
Routes and run rates for every machine.
Live data
Fresh, several times a day.
Rules and goals
Due dates, priorities, costs.
Planning engine
Heuristics and optimisation: a new plan in minutes.
Feasible plan
Dates the plant can keep.
Promise dates
What we can commit to.
Alerts
Shortages and late orders.
What really happened feeds the next plan.
Today
How far VISIONE goes today.
Demand planning
Not yet: orders arrive from sales.
Master planning
Each week’s load against each department’s pace.
Material planning
Missing material per order, eight weeks ahead.
Capacity and bottleneck
Measured every week, per department.
Detailed scheduling
The queue on each machine, as time blocks.
Order promising
Next: dates from real capacity.
Execution feedback
Every order, every phase, every day.
- Working
- Partly
- Next
When it pays off
It pays off where planning is hard. It needs clean data.
It pays off when
- Every order goes through many steps
- Several orders fight for the same machine
- Changeover time depends on the sequence
- Made to order, with tight dates
It needs
- Accurate routes and run rates
- Fresh data, several times a day
- One set of rules, written once
- Planners who trust the plan
Every week
The weekly report: the whole loop on one page.
How the week went
What really happened.
The bottleneck
Where the flow is stuck this week.
The material
What to order or chase now.
The week ahead
Load against capacity: one decision.
plan → execute → measure → replan · every week
How we charge
A diagnosis at a fixed price. Then implementation and subscription.
The diagnosis
It starts when you send us your real files. We process the information and share a document with the proposed key indicators, the sketch of the application, the timeline and the price.
If you go ahead, it is credited in full against implementation.
Contact
Book your FREE initial session.
You tell us how your plant runs and we tell you what we can build with the data you already have.
Estado de México · Available across all of Mexico
We use your details only to answer this request. No mailing list, no sharing with third parties.