A plan the plant can actually carry out.

VISIONE computes the plan within your plant’s real limits: material and capacity together, in minutes, with no changes to the ERP.

The problem

The ERP records everything. Nobody can plan with it.

Many reports

Every department, its own number.

Seen too late

Status arrives the next day.

No capacity limit

The standard plan ignores the machines.

What it is

Advanced planning: material and capacity in one calculation.

Real limits

Every machine and every shift has one.

At the same time

Material and capacity, solved together.

Fast

A new plan in minutes, so it can be redone every day.

How it works

Three inputs, one engine, three outputs and a loop.

  • Plant model

    Routes and run rates for every machine.

  • Live data

    Fresh, several times a day.

  • Rules and goals

    Due dates, priorities, costs.

Planning engine

Heuristics and optimisation: a new plan in minutes.

  • Feasible plan

    Dates the plant can keep.

  • Promise dates

    What we can commit to.

  • Alerts

    Shortages and late orders.

What really happened feeds the next plan.

Today

How far VISIONE goes today.

  • Demand planning

    Not yet: orders arrive from sales.

  • Master planning

    Each week’s load against each department’s pace.

  • Material planning

    Missing material per order, eight weeks ahead.

  • Capacity and bottleneck

    Measured every week, per department.

  • Detailed scheduling

    The queue on each machine, as time blocks.

  • Order promising

    Next: dates from real capacity.

  • Execution feedback

    Every order, every phase, every day.

  • Working
  • Partly
  • Next

When it pays off

It pays off where planning is hard. It needs clean data.

It pays off when

  • Every order goes through many steps
  • Several orders fight for the same machine
  • Changeover time depends on the sequence
  • Made to order, with tight dates

It needs

  • Accurate routes and run rates
  • Fresh data, several times a day
  • One set of rules, written once
  • Planners who trust the plan

Every week

The weekly report: the whole loop on one page.

  1. How the week went

    What really happened.

  2. The bottleneck

    Where the flow is stuck this week.

  3. The material

    What to order or chase now.

  4. The week ahead

    Load against capacity: one decision.

plan → execute → measure → replan · every week

How we charge

A diagnosis at a fixed price. Then implementation and subscription.

1,200 USD · credited back

The diagnosis

It starts when you send us your real files. We process the information and share a document with the proposed key indicators, the sketch of the application, the timeline and the price.

If you go ahead, it is credited in full against implementation.

Contact

Book your FREE initial session.

You tell us how your plant runs and we tell you what we can build with the data you already have.

Estado de México · Available across all of Mexico

We use your details only to answer this request. No mailing list, no sharing with third parties.